Basketball Camp Management System
Brendan Post    Andrew Proper    Nathaniel Rudd

Milestone 6: Application Turnover and Final Project Presentation
6 May 2003

    Milestone Leader - Nate Rudd
    Transitioning the application to the sponsor organization and receiving their final sign-off. This includes development of a user's manual and system administration manual as well as associate training.
    We plan to hand over the application to Coach VanPelt at this time.

Collection of Life Cycle Documents:
Status Reports Milestone Completion Summaries Meeting Summaries
Other Documents:
Milestone 4
  • Physical Database Design
  • User Interface Design: See CS server
  • Design Traceability Matrix (with CRUD analysis)

  • Milestone 5
  • Database Application Implementation
  • Milestone 5 Implementation Status / Milestone 6 Intentions Document
  • Performance Improvements
  • Database Application Test Plans and Results
  • Implementation Traceability Matrix

  • Milestone 6
  • Completed Functionality
  • Direction for Next Project Group
  • Performance Improvements
  • TestResults
  • Source Code
  • User Manual - See printout
  • Final Project Presentation

  • Other Milestones:
    Feel free to take a look at other milestones and our project plan.

    Webboard:
    Post messages and comments on the status of our project. (Admin)

    This document has been changed: Summary of Changes |  02/25 |  03/03 |  03/26 |  04/02 |  04/21 |  05/06